Manteno CUSD #5 - High School Reroof 2025
The project consists of Hot Applied Modified Bitumen Roof Replacement at Manteno High School: Includes removal of spray foam roofing, built-up roofing, insulation and flashings down to existing roof deck. Install mechanically attached Dens Deck Prime, temporary roof, insulation in two layers, wood fiber board and SBS modified base and cap sheets with aggregate surfacing. Replace clamping rings and strainers on all roof drains. Paint strainers red.
PROJECT MANUAL
(click to expand/collapse)

Name | Size | ||
256EX17.400 PROJECT MANUAL | 1.6 MB |