Manteno CUSD #5 - High School Reroof 2025

The project consists of Hot Applied Modified Bitumen Roof Replacement at Manteno High School: Includes removal of spray foam roofing, built-up roofing, insulation and flashings down to existing roof deck. Install mechanically attached Dens Deck Prime, temporary roof, insulation in two layers, wood fiber board and SBS modified base and cap sheets with aggregate surfacing. Replace clamping rings and strainers on all roof drains. Paint strainers red.
00 9100 ADDENDA (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
00 9101 Addenda 001 35.8 KB
00 9102 Addenda 002 40.2 KB