Manteno CUSD #5 - High School Reroof 2025
The project consists of Hot Applied Modified Bitumen Roof Replacement at Manteno High School: Includes removal of spray foam roofing, built-up roofing, insulation and flashings down to existing roof deck. Install mechanically attached Dens Deck Prime, temporary roof, insulation in two layers, wood fiber board and SBS modified base and cap sheets with aggregate surfacing. Replace clamping rings and strainers on all roof drains. Paint strainers red.
Status
Accepting Bids
Prebid Date | 3/18/25 2:00pm |
Bid Date | 4/2/25 2:00pm |
Location
Manteno, IL 60950
Contractors may obtain electronic documents free of charge.
Printed documents may be obtained at cost from Decatur Blueprint, (217) 423-7589, by ordering through this website.
A Pre-Bid Conference will be held at the project site, at 2:00 p.m. on Tuesday, March 18, 2025. Persons interested in visiting the site shall contact Alec Andrewson, Director of Maintenance at (815) 997-0604.
VIRTUAL BID OPENING
Join Zoom Meeting: https://us06web.zoom.us/j/87329796175?pwd=Qd3NNaDx6gboXkvl6b2NxPOl7pjLR5.1
Meeting ID: 873 2979 6175
Passcode: 641587