Monticello CUSD #25 - Washington Elementary Toilet Room Renovations

The project consists of: Toilet room upgrades at Washington Elementary School and an elevator addition within the school. The toilet room scope includes (2) pairs of toilet rooms. Each toilet room scope includes finish flooring, plumbing fixtures, partitions, ceiling, lighting and painted walls. Toilet accessories will be provided by the owner and installed by the contractor. The scope also includes the addition of a three stop electric traction elevator with front and rear door access.
00 9100 ADDENDA (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
00 9101 addenda 2.4 MB
00 9102 addenda 84.8 KB
00 9103 addenda 1.4 MB
00 9104 addenda 545.3 KB